Scotch Creek Water Planning

Scotch Creek Water Study 2018 - Addendum

In 2018, Urban Systems completed the Scotch Creek Water Study for the CSRD. The report was completed in response to the need for safe and reliable water in the Scotch Creek community. The 2018 report summarized the Water Master Plan, provided updated populations, demands, and a comparison of source options.

CSRD have developed a revised Phase 1 service area. Specifically, the Phase 1 service area is proposed to include Captain’s Village Marina (CVM), which currently has an existing water system, Anchor Bay, Peterson Court, and other nearby properties. Based on preliminary engagement with these communities, support has been shown for this project. It is assumed that along with Saratoga, this system will serve as the starting point for future water system development in the area, ultimately expanding and connecting the two systems together as was envisioned in the previous study.

This Scotch Creek Water Study 2018 - Addendum, produced by Urban Systems, provides details for the Phase 1 project. 

View Report

Update - proposed water system 

November 29, 2019

Plans for a referendum and an $8 million infrastructure grant application to expand the water system in Scotch Creek have been abandoned in favour of a new, scaled-back approach.

CSRD directors voted to rescind previous motions made at the October 21 Regular Board Meeting regarding the proposed expansion of the Saratoga Water System. This change of plans followed discussions Electoral Area F Director Jay Simpson conducted with residents, and information gathered from recent meetings with community stakeholder groups in Scotch Creek. Following these discussions, it was determined there was not enough community-wide support for the proposed $8.9 million expansion of the Saratoga Water System into the core of Scotch Creek.

CSRD staff then identified an alternative option to acquire, upgrade and expand the smaller, existing Captains Village Water System. This system would to be expanded to accommodate 73 residential water connections.

The map of the proposed service area is below.

As a result of this new information, the Board supported new motions to spend up to $45,000 on an engineering assessment which will consider the development of a new, smaller community water system to benefit the property owners in and around Captains Village Marina only.

Should the process be successful, the new plan envisions a CSRD water system at each end of the community. This would create the potential opportunity to expand the systems towards each other until such time as the two systems could be joined.​

Next steps

The Board agreed to retain Urban Systems to conduct engineering work on the scaled-back option in preparation of an application for an infrastructure funding grant. Voter assent for the project will take place through a petition process of the residents in the service area. Due to the reduced size of this project, there will not be a referendum, as was planned for the $8.9 million upgrade proposal.

Urban Systems has started work on developing new drawings and engineering specifications for the system, as well as the cost estimates for the project. This information will be presented to the residents benefiting from the new water system in early 2020.

Proceeding with the project will be dependent on whether the CSRD is the successful in their application for the federal and provincial infrastructure grant funding. Without grant funding, the project will not move forward.

The deadline for the CSRD to apply for the Investing in Canada Infrastructure Program Grant is February 26, 2020.

 

Scotch Creek Water Master Plan

This report was completed in 2018 as a response to the need for a safe and reliable water source for the Scotch Creek community. 

Currently, there are multiple private systems in the area, many of which, fail to meet Interior Health water quality standards.

The report identified these existing systems and their shortcomings. It made design assumptions related to populations, and design flows, and proposed a new system based on these assumptions. Sources of water were also evaluated in the report. 

There is a renewed interest in constructing a system to address water quality issues and to encourage development in the Scotch Creek area.

The primary interest of the CSRD is to provide good quality water to areas that have poor water quality now.

Click to view complete report
Timeline of events

 

 

Project information - 2019

Updates on the proposed Scotch Creek Water System 

November 4, 2019

Based on discussions with Electoral Area F Director Jay Simpson, and information gathered from recent meetings conducted with community stakeholder groups in Scotch Creek, CSRD staff will be recommending to the CSRD Board that current efforts towards the development of a community water system in Scotch Creek through the expansion of the Saratoga Water System and the associated referendum be discontinued at this time.

This discontinuation does not apply to the current expansion of the Saratoga Water System to include Copper Island RV Park.

CSRD staff will be recommending to the Board at the November 21, 2019 Regular Meeting, that Urban Systems be retained to conduct an engineering assessment of the development of a new, smaller community water system to service the property owners in and around Captains Village Marina only.  This engineering work would be conducted in preparation of an application for an infrastructure funding grant.

The CSRD will provide an complete update and news release following the November Board meeting.

 

October 18, 2019

Eligible voters in Scotch Creek will be asked to decide whether they support the development of a community water system to serve the area.

At the October 17 Regular Meeting, Columbia Shuswap Regional District (CSRD) Directors endorsed conducting a referendum to determine if there is community support for proceeding with a plan to expand the current Saratoga Water System.

Based on the 2018 Water Master Plan, the anticipated cost for Phase 1 of the project is estimated at approximately $8.9 million.

In August 2019, the CSRD’s funding application to assist with the development of the Scotch Creek community water system was denied by a Federal and Provincial Infrastructure program.

A new round of Investing in Canada Infrastructure Program - Green Infrastructure grant applications was announced in September 2019, and the deadline is February 26, 2020. Approximately 73 per cent of the eligible costs could be covered through a successful application to this program. The remaining project costs will need to be borrowed. Without grant funds, the CSRD is not in a financial position to proceed with the project.

Community support is a key factor in strengthening the CSRD’s application under this granting program, which will be submitted if the referendum passes. A referendum date is still to be determined, however, the vote will be planned for January or early February, 2020, in order to apply for the grant before the deadline. The CSRD recognizes the referendum date may be concern for seasonal residents, therefore, a mail-in ballot will be available as an option, in addition to general and advance voting opportunities. Details on the referendum process and financial implications to residents within the service area will be provided in the next steps of the referendum process.

The Board also approved spending up to $100,000 to conduct the referendum and an associated public engagement and information process to help voters understand what this project will mean to them and the community. Urban Systems, the consultants involved in developing the Scotch Creek Community Master Water Plan, will assist with the community engagement process.

 

August 29, 2019

The CSRD was advised by the Investing in Canada Infrastructure Program on August 28, 2019 that the grant application for the Scotch Creek Water Extension was not one of the projects selected for funding.

The Scotch Creek Master Water Plan identified a service area in Scotch Creek for which a community water system would be built, owned and operated by the CSRD. The project was intended to develop the first phase of an overall Scotch Creek water system valued at $8.9 million. Due to the costs involved with moving the project forward, it was subject to the receipt of 73 per cent capital grant funding from the provincial and federal governments. The CSRD applied to the Investing in Canada Infrastructure Program for a grant of $6.5 million. Upon successful award of a grant, the CSRD was planning to move forward with a referendum (assent process) for residents in the proposed service area to determine community support for the project.  

Without these grants funds, the CSRD is not in a position to move forward with the project at this time. 

The CSRD will consider future grant opportunities for the capital infrastructure for the Scotch Creek Water Extension when they arise.

View Media Release
Project work and history prior to 2019

Process and project history

September 2018

The draft report represents work completed to-date with the Scotch Creek Community Master Water Plan Advisory Committee and Urban Systems. Information and feedback received from the Open House was incorporated into the  report along with information that will makes up the Appendix reports. The final draft report was approved by the CSRD Board.

Map -  Loan Repayment Service Area
Map -  Proposed Water Service Area

Community Open House - Thursday July 26, 2018 

The CSRD hosted a public open house event to provide information on the progress made on the Scotch Creek Community Master Water Plan update of the 2007 Scotch Creek Water Study.  The Open House took place on Thursday, July 26, 2018 at the Scotch Creek Community Hall (Scotch Creek/Lee Creek Fire Hall).  

Open House PowerPoint Presentation
Open House Poster Board Presentation

   

July 12 & 16, 2018 Committee Workshop

The Scotch Creek Community Master Water Plan Review Advisory Committee met on July 12 & 16, 2018 at the Scotch Creek Community Hall to review the options for advancing a community water system in Scotch Creek and to select a preferred option.  The Committee approved the format of the presentation of the preferred option at the open house to be held on July 26, 2018.

March 13, 2018 Committee Meeting 

The first meeting of the Scotch Creek Community Master Water Plan Review Advisory Committee took place on Tuesday, March 13, 2018 at 1:00 PM at the Scotch Creek/Lee Creek Community Hall.

Urban Systems is the engineering consultant hired by the CSRD to undertake an update of the 2007 Scotch Creek Water Study.  

Meeting #1 PowerPoint Slide Presentation
March 13, 2018 Minutes of Meeting 

January 5, 2018

The CSRD engaged an engineering consultant to review and update the 2007 Scotch Creek Master Water Plan for the community of Scotch Creek in Electoral Area F. An advisory committee has been established with representatives of the CSRD, the Electoral Area Director, representatives from Interior Health, First Nations and members of the public (residential and business.)

There is a renewed interest in the community to address water quality issues and to encourage development in the Scotch Creek Area.  It is important to have an updated Master Water Plan in order to be ready for any potential grant opportunities that may be available in the future.  The Advisory Committee will work collaboratively to provide input and feedback to a final report drafted by the engineering consultant. The report will focus on the feasibility of developing a phased water system that could be expanded in the future, and will identify capital and operating cost estimates. 

View 2007 Report
Committee Terms of Reference 

For further information please contact: 

Terry Langlois, Team Leader
Utilities 

T: 250.833.5941
E: tlanglois@csrd.bc.ca