Is a building permit required for a structure that is under construction when the service takes effect?

No building permit is required for new single-family buildings and accessory buildings that are under construction when the service is introduced, provided that concrete footings, built in compliance with the Building Code, are poured prior before the amended service bylaw takes effect. A property owner in this situation needs to submit proof to the CSRD to confirm that the concrete footings were poured prior to the date of service commencement. Proof may include, at a minimum, information such as an email stating the date on which the pour occurred, combined with a time-stamped picture of the pouring, and a copy of the concrete delivery receipt. To be clear, future additions to buildings that exist prior to the introduction of building inspection will require building permits

Show All Answers

1. Do I need a building permit for a cannabis production facility?
2. Do I need a building permit for a farm building?
3. How do Building Inspections protect the public health and safety?
4. How do I arrange a Building Inspection?
5. How does an owner apply for a building permit?
6. How will inspections be carried out in remote locations throughout in EA B, EA C and EA E?
7. In what new Electoral Areas (EAs) are Building Permits (BPs) required?
8. Is a building permit required for a structure that is under construction when the service takes effect?
9. What are the building permit fees?
10. What can I do if I am concerned about my neighbor who may be constructing without a building permit?
11. What days will inspections be available in our area?
12. What do the new six inspections cover?
13. What happens in EA F if my current BP that was issued under the previous Building Regulation Bylaw No. 630 expires and is renewed after the new Building Bylaw No. 660 is effective March 5, 2018?
14. What is a Site Disclosure Statement?
15. What is Building Inspection?
16. What is the building permit process?
17. What is the time period between issuance and expiry of a building permit?
18. What other permits (in addition to a building permit) may be required?
19. When did the Building Inspection service start in Electoral Area C? When did it start in Electoral Areas B and E? When did it start in Electoral Area F?
20. When is a building permit NOT required?
21. When is a building permit required?
22. Where can I find information on the BC Building Code?
23. Why are six inspections required?